Burnt Store Road Improvements Coming

0
155

This week the Lee County Board of Commissioners awarded a contract to resurface a section of Burnt Store Road to be more resilient to erosion and washout while improving drainage and reducing long-term maintenance costs.

The low-bid contract includes removing deteriorated asphalt, stabilizing the road base and applying new asphalt designed to increase drainage efficiency. The Burnt Store Road section to receive the upgrades is from NW 41st Terrace to Gator Slough Canal.

The roadway serves as a direct evacuation route. The work is needed to protect the roadway from future damage and to ensure the evacuation routes function properly.

The work is expected to begin in the Spring and take 4 months to complete.